The western half of the 101-acre property was developed in 1962 as a manufacturing facility, and later used as a storage facility and a retail business. Landmark was contracted to perform a Phase I Environmental Site Assessment, a wetland delineation, and a forest stand delineation on the subject property by the developer who intended to […]
Market Sector: Water Resources/Restoration
Water resources engineering, channel restoration and streambank restoration projects.
Channel Restoration at Avenue North
Channel restoration at Avenue North is an award winning project that included channel restoration, bank stabilization and new innovative stormwater outfall structures to prevent erosion and loss of habitat and tree canopy. It improved downstream water quality for a large drainage system and reduced risk to the public and private infrastructure associated with the mixed-use […]
Airport Off-Site Wetland Mitigation
This 9.06± acre forested/scrub-shrub Wetland Mitigation project consisted of four separate wetland creation “pods” that were constructed in Selbyville, Delaware during spring 2012 as off-site compensatory mitigation for runway expansion activities conducted at the Delaware Coastal Airport in Georgetown in order to resolve an outstanding wetland violation from the 1990s, Landmark scientists coordinated closely with […]
Eagle Run Road Connector
Eagle Run Road connector is an award winning project involving a one-mile roadway extension that required stream stabilization for two bridge spans, extensive environmental services, and design for one mile of roadway widening. The project won the engineering excellence Conceptor Award in 2020 for the work completed by Landmark’s staff who performed integrated science and […]