The Brownfields redevelopment project at 721 Terminal Avenue began with conducting a Phase I environmental site assessment (ESA) and a wetland delineation for a buyer considering the undeveloped 2-acre property in Wilmington, Delaware. Based on the findings, a Phase II ESA was conducted. The buyer entered the property in the DNREC State Brownfields Development Program […]
Market Sector: Industrial
Christina Waterfront Brownfield
Landmark was contracted by the owner to provide DNREC HSCA Brownfield Redevelopment planning for the 6-acre (Jablow) site, DNREC negotiations, investigation, and cleanup oversight. The engineering work performed included regrading and clean up of an existing contaminated ditch and erosion and sediment control to ensure that contaminated materials did not reach the Christina River, a […]
King Farm Industrial Park Georgetown
The King Farm Industrial Park is a 74-acre industrial park located in Georgetown, Sussex County, adjacent to Delaware Coastal Airport. The site includes 11 contractor condominiums (ranging from 9,000 SF each) and four warehouses totaling 380,110 square feet. Landmark performed master planning, land surveys, site design, water and sanitary sewer, stormwater management, and agency processings. […]
Riveredge Industrial Park, New Castle
The Zenith Products facility was developed and constructed as an integrated design project within the 500-acre Riveredge Industrial Park in the City of New Castle. Landmark worked directly for Norwood Construction to complete the design and construction of this 490,000+ square foot warehouse with attached 49,000 square foot office facility. Parking lots, access roads, and […]
Delaware Coastal Airport Industrial Park
Landmark has performed the planning, site design, surveying, and environmental services for several projects at the Delaware Coastal Airport’s adjacent Industrial Park in Georgetown, Sussex County, Delaware. Project examples at the industrial airpark include: Wiley and Sons Propane Environmental services for a proposed bulk propane unloading and storage facility. CATEX Form assistance included a Wetland […]